Our approach
Core applications
Product Range
Data Driven
Environmental performance


Case Studies

Fourphase Online Desanding Illustration
Case Studies
July 9 2024
Production maintained - online desanding of separator
Read more
Immortelle Compressed
Case Studies
May 13 2024
Optimizing production from a dry-gas well using active topside sand control
Read more
Fourphase Subsea 2560X1200
Case Studies
March 17 2024
Hydrocarbon production with sand through subsea tree and steel catenary (SCR) riser w. FourPhase
Read more
Fp Harbour Energy Judy P08 P20 09
Case Studies
January 10 2024
Optimisation of a shut-in sand producing well using a DualFlow and MPFM
Read more
Fp 1085
Case Studies
October 30 2023
Ensuring production by removing solids upstream produced water pump
Read more
Fp 1172 Alvheim 07 Min
Case Studies
October 3 2023
Solids jetting of a production separator on a FPSO
Read more
Fourphase Offshore Gulf Of Mexico
Case Studies
September 27 2023
Enabling production from a shut-in gas and condensate well
Read more
Fourphase Desander Sand Management System North Sea
Case Studies
January 16 2023
30% hydrocarbon production increase on a sand-producing gas well
Read more
Fourphase Desander Offshore Filter Solution
Case Studies
January 13 2023
Efficient surface sand removal adds $2.6M monthly production
Read more
Sharing Image Siri
Case Studies
November 29 2022
$17M production maintained - Online separator jetting
Read more
Fourphase Closed Loop System
Case Studies
October 5 2022
$25M production maintained - online desanding of production separator
Read more
Offshore Solids Management Uk North Sea
Case Studies
September 8 2020
Managing solids from a high gas producer
Read more
Fourphase Desander On Vessel
Case Studies
August 26 2022
FourPhase and Expro delivers the first monohull riser-based CT intervention on NCS
Read more
Fourphase Rig Up
Case Studies
July 20 2022
Safe scale separation during Coiled Tubing operation
Read more
Fourphase In The Us On Truck
Case Studies
May 26 2021
Returning the shut-in “devil’s well” to production
Read more
Img 20211103 110314
Case Studies
May 10 2018
Kickstarting a well with damaged screens
Read more
20210923 Fourphase 087 02 Test Room
Case Studies
April 26 2022
Cleanout operations following well restart
Read more
2021 Fourphasenature 20121128 007
Case Studies
January 26 2013
Optimal production with zero flaring
Read more