Unmanaged solids generated through intervention cause solids handling limitations topside, lower efficiency and cause erosion. Ultimately making a shutdown inevitable. Adopting a separation system during Coiled Tubing Clean-Out (CTCO) mitigates this risk.
Apply data
Without accurate solids data topside, CT operates on assumptions, which risks solids (often several tons) remaining in the wellbore creating difficulties for ongoing operations. Recording accurate solids data, our separation systems enable interpretation of actual data, alongside the estimated solids calculations, creating the insight needed to boost the efficiency and quality of CT operations.
Data driven operations
Real-time solids data boosts the efficiency and quality of CT operations
Enables real time decision making
Prevents issues associated with getting stuck in hole
Creates confidence to operate at optimal speeds
Guarantees a proper cleanout
Automated control means no additional personnel offshore
Prevents issues associated with getting stuck in hole
Creates confidence to operate at optimal speeds
Guarantees a proper cleanout
Automated control means no additional personnel offshore
![Fourphase 152 05 Operations Room](/assets/media/designs/uploads/pages/element/540/fourphase-152-05-operations-room-422731.jpg)
![Fourphase 152 05 Operations Room](/assets/media/designs/uploads/pages/element/540/fourphase-152-05-operations-room-422731.jpg)
Designed to optimise CT
Ease of integration onto a crowded deck alongside a CT stack was essential in our design. Our DualFlow unit, with its 2×2 metre footprint, is the smallest dual cyclonic desander on the market. The stackable choke preserves the compact footprint of the system as well as integrates into the Dualflow. This creates a flexible, compact system, which can be operated by one operator.
DualFlow
![Ct Closed Loop Inc Flowmeter3](/assets/media/designs/uploads/pages/element/540/ct-closed-loop-inc-flowmeter3-115063.jpg)
![Ct Closed Loop Inc Flowmeter3](/assets/media/designs/uploads/pages/element/540/ct-closed-loop-inc-flowmeter3-115063.jpg)
Clear ESGQ value
As an automated system, no additional personnel are needed offshore, and risks associated with manual handling are removed. The efficiencies gained during CTCO result in reduced separator jetting operations, which can boost ESG metrics.
Environmental performance
![Fourphase Nature 20210923 035](/assets/media/designs/uploads/pages/element/540/fourphase-nature-20210923-035-574563.jpg)
![Fourphase Nature 20210923 035](/assets/media/designs/uploads/pages/element/540/fourphase-nature-20210923-035-574563.jpg)
![Preview 20210923 Fourphase 093 02 Test Room](/assets/media/designs/uploads/pages/element/1280/preview-20210923-fourphase-093-02-test-room-176912.jpg)
![Preview 20210923 Fourphase 093 02 Test Room](/assets/media/designs/uploads/pages/element/1280/preview-20210923-fourphase-093-02-test-room-176912.jpg)
Longer term thinking
Repeated CT is not a long-term solution to remove solids build up in the well. It delivers one off removal but does not mitigate against subsequent build up. Another clean out will be inevitable. To prevent this, a proactive long-term solids management solution can be put in place.
Optimised production
Restart wells without intervention
If contact with the reservoir can be achieved, our separation systems can kick start a producing well without the need for CT. This delivers intervention free clean-up of underperforming or shut-in wells and provides benefits including reduced OPEX and POB and the removal of heavy lifting activities.
![Fourphase 081 02 Test Room](/assets/media/designs/uploads/pages/element/610x600/fourphase-081-02-test-room-210787.jpg)
![Fourphase 081 02 Test Room](/assets/media/designs/uploads/pages/element/610x600/fourphase-081-02-test-room-210787.jpg)
Insights
Overview
Use data to improve the efficiency and quality of CT operations
Prevents issues associated with getting stuck in hole
Easy to integrate
Delivers ESGQ benefits
Prevents issues associated with getting stuck in hole
Easy to integrate
Delivers ESGQ benefits
![Fourphase 127 03 Logistics Dep](/assets/media/designs/uploads/pages/element/540/fourphase-127-03-logistics-dep-249501.jpg)
![Fourphase 127 03 Logistics Dep](/assets/media/designs/uploads/pages/element/540/fourphase-127-03-logistics-dep-249501.jpg)