

Presentation: 24-months of continuous increased production using a topside desander
Presented by Olof Nilsson at the 2024 SMN Euroforum in Aberdeen. The presentation shares a case study where FourPhase used a topside desander to resume production in a previously shut in well. The intervention was successful and led to another 24 months of production.
Download pdf

