Our approach
Core applications
Product Range
Data Driven
Environmental performance
Resources
Case Study Fourphase Shell Gannet Increased Production
Case Study Fourphase Shell Gannet Increased Production

Presentation: 24-months of continuous increased production using a topside desander

Presented by Olof Nilsson at the 2024 SMN Euroforum in Aberdeen. The presentation shares a case study where FourPhase used a topside desander to resume production in a previously shut in well. The intervention was successful and led to another 24 months of production.

Download pdf
Smn
Smn