Our approach
Core applications
Product Range
Data Driven
Environmental performance
Resources

Ensuring secure return handling with minimal footprint during a pre P&A operation in the North Sea
Norwegian North Sea, 2025
FP-1251

Challenge

Aker BP executed a multirun coiled tubing and wireline intervention on a well in the North Sea. FourPhase was engaged to manage returns throughout the intervention, protecting topside equipment on a highly space constrained platform. The goal was automated handling of returns with minimal disruption to concurrent activities.
Case Study Data Illustration Ula
Case Study Data Illustration Ula

Solution

FourPhase deployed its return package including DualFlow cyclonic separation, a remotely operated choke and Multiphase flowmeter (MPFM), to capture solids and measure them in real time during Coiled Tubing (CT) and Wireline (WL) operations. FourPhase supported rig-up, operation, and rig-down phases without impacting parallel scopes, aligning with the customer intervention program requirements. Operational highlights included:
• Returns handling to prevent solids ingress to separators
• Optimisation of choke settings during CT cleanout runs
• Continuous separation across DualFlow vessels, enabling flushing without process interruption

Results

• Separation performance: “Separation efficiency was good; no reports of solids passing the FP equipment.”
• Operational reliability: “No ESG&Q incidents or downtime caused by FourPhase equipment or personnel.”
• Compliance & decontamination: Post-job Mercury and NORM inspections confirmed acceptable readings after washing of DualFlow, choke frame and flowmeter assemblies from the operation.